General Contractor in San Mateo County, CA

Cicarelli Contractors, a CSLB-licensed general contractor (License #1109419) based in Richmond, California, serves 8 cities in San Mateo County, 32 miles from our base, with pool removal, demolition, excavation, pavers, retaining walls and artificial turf. We pull the permits and send a written quote within 24 hours.

  • Permits and inspections handled
  • CSLB License #1109419
Paver side-yard walkway with a planter wall in Burlingame, built by Cicarelli Contractors
Burlingame, San Mateo CountyPaver side-yard walkway

Peninsula

Working in San Mateo County

San Mateo County runs down the Peninsula from Daly City to Menlo Park. Our project gallery includes two jobs in Burlingame: a pool removal finished with artificial turf and pavers, and a paver side-yard walkway with a planter wall.

Peninsula cities write very specific pool demolition rules. Millbrae decides when a partial removal is allowed, San Mateo counts filling a pool with soil as a demolition, and Menlo Park asks for a geotechnical report before anything new is built over the old pool.

Peninsula services

Pool Removal and Hardscape for San Mateo County Homes

From Daly City to Menlo Park, every Peninsula city has its own pool rules. As a general contractor in San Mateo County, we plan the removal around them and build the yard you want next.

Get A Free Estimate

Filmed on the Peninsula

Watch Our Hillsborough Pool Demolition and More

The first clip was filmed in Hillsborough, in San Mateo County. The others follow the same crew on pool removals in Fremont, Vacaville and San Ramon.

Watch On YouTube

Proof on the Peninsula

Why San Mateo County Families Choose Cicarelli Contractors

4.9★

Average on Google

8

Peninsula cities served

2

Burlingame projects in our gallery

Empty in-ground pool with leaves before removal
  • Licensed General Contractor

    CSLB License #1109419, B General Building, active and bonded.

  • Quote by the Next Day

    A written estimate within 24 hours of the visit, with the city's removal rules spelled out.

  • City Rules Followed

    Millbrae's partial removal limits, San Mateo's fill rule and Menlo Park's geotech report are part of the plan.

  • Covered for a Year

    1-year workmanship warranty from completion, in your contract.

Peninsula before and after

Before and After, Including Our Burlingame Pool Removal

The first project is in Burlingame: a pool replaced with turf, pavers and a gazebo. Drag each slider to compare.

See All Projects
After: the same backyard with artificial turf, pavers and a gazebo after pool removalBefore: swimming pool in a Burlingame backyardBeforeAfter

Burlingame Pool to Backyard

Burlingame · Turf, pavers and gazebo

After: green artificial turf lawn where the pool used to beBefore: excavator removing an in-ground poolBeforeAfter

A Lawn Instead of a Pool

Pool removal and turf

After: front yard with artificial turf and stepping stonesBefore: front yard before the turf makeoverBeforeAfter

Curb Appeal Upgrade

Front-yard turf and stepping stones

Our Peninsula steps

The Steps Behind a San Mateo County Pool Removal

Peninsula cities inspect closely. These steps keep your project moving from the first visit to the city sign-off.

Start With A Free Estimate
  1. Step 01

    Visit and Measurements

    We check the pool, access and what you want to build, because that decides partial or full removal.

  2. Step 02

    Quote and City Rules

    Within 24 hours you get a written quote that follows your city's pool demolition rules.

  3. Step 03

    Demolition Permit

    We apply to your city, or to the county for unincorporated areas, before any work starts.

  4. Step 04

    Removal and Compaction

    The shell comes out or is broken and drained, and fill is compacted in layers.

  5. Step 05

    Report and Final

    Where required, the geotechnical report and final inspection come before any new construction.

  6. Step 06

    New Yard and Warranty

    Turf, pavers or a patio go in, backed by our 1-year workmanship warranty.

Google reviews to read before hiring in San Mateo County

Two of our Google reviews, word for word, picked for San Mateo County homeowners comparing contractors.

4.9 45 Google reviews
Dave "Davie"Fiberglass pool removal · Permit & compaction report

★★★★★

Apr 2026
Ciccarelli demoed and filled our fiberglass pool very quickly and efficiently. Highly recommend them if you are looking to fill in your pool. They handled the city permit process for demo and provided an engineering compaction report. The cost was very reasonable compared to other quotes I received.
Tania Llaujel RodriguezBackyard & front yard pavers

★★★★★

Jul 2026
We are extremely happy with the job performed in my backyard. And my front yard It was done very fast and the quality of the job is excellent. Highly recommended because you have a great service at a reasonable price.

Read more reviews · All 45 on Google

San Mateo County cities we serve

We serve every area listed here; dedicated pages are on the way.

  • Daly City, California

    Daly City

    The second-most populous city in San Mateo County, sharing almost all of its northern border with San Francisco. Population 104,901.

    Free estimate in Daly City
  • South San Francisco, California

    South San Francisco

    A Peninsula city known locally as "South City", on the San Francisco Bay side of San Mateo County. Population 66,105.

    Free estimate in South San Francisco
  • Millbrae, California

    Millbrae

    A northern San Mateo County city next to SFO, with clear rules on when a partial pool removal is allowed. Population 23,216.

    Free estimate in Millbrae
  • Burlingame, California

    Burlingame

    A Peninsula city with a long bay shoreline, named after diplomat Anson Burlingame. Two of our gallery projects are here. Population 31,386.

    Free estimate in Burlingame
  • San Mateo, California

    San Mateo

    The most populous city in San Mateo County, about 20 miles south of San Francisco, whose permit guide counts filling a pool as demolition.

    Free estimate in San Mateo
  • Foster City, California

    Foster City

    A master-planned bayside city next to San Mateo, home to companies such as Gilead Sciences, sometimes counted as part of Silicon Valley.

    Free estimate in Foster City
  • Redwood City, California

    Redwood City

    The San Mateo county seat, about 27 miles south of San Francisco, with the only deepwater port on the Bay south of the city. Population 84,292.

    Free estimate in Redwood City
  • Menlo Park, California

    Menlo Park

    A city at the eastern edge of San Mateo County next to Palo Alto, which requires a geotechnical report before building over an old pool. Population 33,780.

    Free estimate in Menlo Park

Map of San Mateo County

The 8 cities we serve in San Mateo County. Tap a pin or a name for details.

San Mateo County8 cities served

Permits

Building permits in San Mateo County

In San Mateo County, the city where the home sits issues the building or demolition permit. Homes in unincorporated areas get it from the county instead, through San Mateo County Building Inspection. Each office sets its own fees, plans and inspections, and Cicarelli Contractors pulls the permit and schedules every inspection.

Local rules in San Mateo County

  • Millbrae allows partial removal only for landscape or garden areas and requires complete removal under a structure, driveway, patio or deck, according to its pool and spa demolition requirements. Owners also sign an acknowledgement agreeing to disclose the partial demolition upon sale.
  • The City of San Mateo Pool and Spa Abandonment and Demolition Guide says the permit requirement includes removing pools or filling them with fill material.
  • Menlo Park requires fill compacted to 90 percent and a geotechnical report from a licensed engineer, and the demolition permit must pass final inspection before a permit for new construction over the pool area is issued, according to its pool demolition permit requirements.

Compare San Mateo County with other Bay Area cities in our pool demolition permit guide.

Local guide

Pool removal and backyard projects in San Mateo County: what to know

A pool removal or backyard project in San Mateo County starts with one question: who issues the permit. Across the 8 cities we serve in San Mateo County, the city building department issues it; in unincorporated areas, San Mateo County Building Inspection does. Cicarelli Contractors, a CSLB-licensed general contractor based in Richmond, pulls the permit, schedules the inspections, removes the pool or concrete and builds what comes next with the same crew.

How long does it take to get a building permit in San Mateo County?

It depends on the city. Peninsula cities write detailed pool demolition rules, and Menlo Park requires the demolition permit to pass its final inspection, with fill compacted to 90 percent and a geotechnical report, before it issues a permit for new construction over the pool area.

For a job in Daly City, South San Francisco and Millbrae, the written estimate from Cicarelli Contractors lists the permit, the inspections and the order of the work, and the crew sends photo updates while it is underway. See the official San Mateo County Building Inspection site for current processing notes.

Do you need a permit to fill in a pool in San Mateo County?

Yes. The City of San Mateo guide says the permit requirement includes removing pools or filling them with fill material, and Millbrae requires a demolition permit before any partial or complete removal. In unincorporated areas, the county Planning and Building Department issues it.

Keep the permit and the final inspection with your house records in Daly City and South San Francisco; buyers and future contractors ask for them. More on the pool removal page.

What can you build after a pool removal in San Mateo County?

The city may decide for you. Millbrae allows partial removal only under landscape or garden areas and requires full removal under a structure, driveway, patio or deck, and Menlo Park wants a geotechnical report and a passed final inspection before any new construction over the pool.

Pool removal rules to know in San Mateo County
WhereRule
MillbraePartial removal only under landscape or garden areas; full removal under a structure, driveway, patio or deck
Menlo ParkFill compacted to 90 percent and a geotechnical report; final inspection before any new construction permit
City of San MateoFilling a pool with fill material counts under the permit requirement

In Millbrae, a structure, driveway, patio or deck over the old pool requires complete removal, and Menlo Park asks for a geotechnical report first. Compare full pool removal, artificial turf and paver patios, or read what you can build after a partial removal.

Updated · By Athalyson Bernardo, Owner of Cicarelli Contractors

FAQ

San Mateo County questions

Planning a project in San Mateo County?

Share your San Mateo County address by phone or text, Monday to Saturday from 9 am to 5 pm, or browse the full FAQ.

Call (650) 404-7049
Does Cicarelli Contractors work in all of San Mateo County?

Yes. Cicarelli Contractors works in 8 cities in San Mateo County, including Daly City, South San Francisco, Millbrae, Burlingame, San Mateo and Foster City. Unincorporated communities in the county can usually be confirmed with a quick call. Every job starts with a free on-site estimate and a written quote within 24 hours.

Do you need a licensed contractor for pool demolition in San Mateo County?

Yes. California's Contractors State License Board licenses this work under classifications such as B General Building, C-21 Building Moving and Demolition and C-53 Swimming Pool. Cicarelli Contractors holds B license #1109419. Before you hire anyone in San Mateo County, ask for the license number and look it up on the CSLB website.

How do I apply for a building permit in San Mateo County?

In unincorporated San Mateo County, apply through the county's Online Permit Center, where the Planning and Building Department reviews and inspects the work. Cities such as Millbrae, San Mateo and Menlo Park take their own applications and publish their own pool rules. Cicarelli Contractors prepares the application and pulls the permit for you.

How long does a pool removal take in San Mateo County?

It depends on the city's rules and inspections. In Menlo Park, the demolition permit must pass its final inspection, with fill compacted to 90 percent and a geotechnical report, before a permit for new construction over the pool is issued, so plan both steps into the schedule.

Can I do a partial pool removal in Millbrae?

Only for a landscape or garden area. Millbrae allows partial removal for landscape or garden use and requires complete removal where a structure, driveway, patio or deck will go. Owners sign an acknowledgement agreeing to disclose the partial demolition upon sale, so plan full removal if you might build there later.

How do I get a free estimate in San Mateo County?

Send photos of your yard and your address in Daly City, South San Francisco and Millbrae or anywhere else in San Mateo County through the free estimate form, or call or text (650) 404-7049. Cicarelli Contractors visits, measures the work and sends a written quote within 24 hours that lists the work, the permit and the schedule.