Demolition Contractor for Bay Area Homes

Cicarelli Contractors is a licensed demolition contractor for Bay Area homeowners, taking out concrete slabs, patios, driveways, garages, pools and whole houses. We file the permit and the air district notice, coordinate the utility shut-offs, haul the debris and leave the ground ready for what comes next.

  • Permit and air district notice handled
  • CSLB License #1109419
  • Mon–Sat, 9 am–5 pm

Free Demolition Estimate

Where should we send your estimate?

Written and itemized, within 24 hours of the site visit or the photos we need.

What you type is saved as you go, so we can follow up even if you leave before sending. Privacy policy

Residential demolition

What a Demolition Contractor Does on a Home Project

A demolition contractor takes out what is in the way, safely and legally, so the next phase of a project can start. On a home lot that usually means hard demolition: concrete, masonry, footings and framing that call for excavators, breakers and trucks rather than hand tools.

The breaking is the visible part. Before it, the permit is filed, the air district is notified, the utilities are shut off and capped, and buried lines are marked. After it, the debris is sorted and hauled, and the ground is graded or compacted so a patio, a driveway or a new foundation can go on top.

Most of what our crews take out is concrete: pool shells, slabs, patios and driveways, for homeowners and for commercial properties across nine Bay Area counties, from Richmond and Berkeley to San Jose. Unlike many demolition contractors, we can also build what replaces it: pavers, turf or retaining walls on the same ground.

What Customers Say About Our Demolition Crews

Nine Google reviews quoted word for word, most of them from pool demolitions, the heaviest concrete jobs we do. Swipe or use the arrows to read them all.

Jim FrizzellPool demolition on a hillside

★★★★★

2025
I recently hired Cicarelli Contractors for demolition of my swimming pool. From our initial discussion to our final completion Athalyson and his crew were true professionals. Our pool is on a hill with limited access. His crew was able to get their equipment in place for the demolition and wheelbarrow fill dirt up hill. Some of those days had 90+ temps.

I was consistently impressed with the quality and professionalism of his crew. His crews seemed to always have a smile. The project was completed in a timely manner. His crew were consistently courteous and respectful of my property and maintained a clean work environment, restoring the site to its original condition.

I highly recommend Cicarelli Contractors for any construction needs. Their commitment to quality, efficiency, and customer satisfaction is commendable.

I wouldn’t hesitate to hire Cicarelli again!
Gigi LimPool demolition

★★★★★

2025
I hired Cicarelli contractor for the demolition of my swimming pool. From the initial consultation through to the final walk through. I was consistently impressed with the quality of their service. Athalyson demonstrated exceptional responsiveness to my inquiries and concerns. The project was completed according to the agreed timeline. Any unforseen issues were addressed promptly and efficiently. The team exhibited a high degree of professionalism throughout the project. They were consistently courteous and respectful of my property. They diligently maintained a clean work environment, restoring the site to its original condition daily. Always on time.

I highly recommend Cicarelli contractors for any construction needs. Their commitment to quality, efficiency, and customer satisfaction is commendable. Furthermore, he can give you a significant discount, making their services even more valuable.
Belis EtemPool demolition

★★★★★

2025
Bernard completed our pool demolition job promptly and professionally. I was very pleased that he was able to start so quickly as I had a deadline to meet. I would recommend him. It was especially convenient for me that he was able to text me updates and send me photos along the way as I handled the job remotely. Thank you, Bernard!
Gloria McLaughlinFinished in 4 days

★★★★★

Dec 2025
Very professional. It was explained what was going to be done.

They were done in 4 days. Other companies gave us a time limit of 2 weeks. Hard workers. We will use this company again. We need more work done.
Andy LiPool demolition

★★★★★

2025
Cicarelli just completed our pool demolition job promptly and professionally. I was very pleased that he was able to start so quickly. And I would recommend him. It was very convenient for me that he was able to text me updates and send me photos along the way of the work done. Super for the great work completed!
Bay Cleaning CoPool removal

★★★★★

2024
We recently hired Cicarelli Contractors to remove our old, unused pool, and we couldn’t be more pleased with the results! From the start, their team was professional, punctual, and extremely knowledgeable. They walked us through the entire process, providing clear explanations and a fair estimate.
Julio GarciaCompleted on time

★★★★★

Jul 2026
Excellent job and ZERO complaint. The project was done on time.
Julia DCrew & communication

★★★★★

2025
Great Job. Good communication. Hard working crew.
Tim McGawPool demolition

★★★★★

2025
Did a great job of demolishing old pool! Would hire again.

Browse every review on our reviews page

Demolition on video

Our Breakers and Excavators on Real Jobs

Most of the demolition we film is pool shells, the heaviest concrete a backyard holds. These clips from Fremont, San Ramon, Vacaville and Hillsborough show how our crews work with breakers and excavators on tight residential lots.

Watch On YouTube

What we demolish

Three Kinds of Demolition We Handle

Our demolition services fall into three groups. Each has its own page with the steps, the paperwork and the questions to ask before work starts.

Concrete & Slab Removal

Slabs, footings, walkways and old pads broken out, the rebar cut and the debris hauled, with the subgrade left ready for a new surface.

  • Patios, pads, walkways, footings
  • Rebar and mesh cut on site
  • Subgrade graded for what comes next
About concrete removal

House Demolition

Houses, garages and sheds taken down after the surveys, the permit and the air district notice, with the foundation removed and the lot graded.

  • Teardowns, garages, sheds
  • Asbestos and lead checked first
  • Foundation out, lot graded
About house demolition

Taking out a pool? It has its own page: pool removal and pool demolition.

Demolition step by step

From Walkthrough to Clean, Graded Ground

The paperwork comes first on purpose: a job stopped halfway costs more than a later start.

Start With A Free Estimate
  1. Step 01

    Walkthrough and Scope

    We look at what comes out, what stays, and how machines and trucks will reach it.

  2. Step 02

    Surveys When Needed

    Older structures are tested for asbestos and lead before anything is disturbed.

  3. Step 03

    Permit and Air Notice

    The city permit is filed and the Bay Area Air District is notified ahead of the work.

  4. Step 04

    Utilities and 811

    Gas, power and water are shut off and capped, and buried lines are marked.

  5. Step 05

    Break, Sort, Haul

    Machines do the heavy breaking; material is separated where possible and trucked out.

  6. Step 06

    Grade and Hand Over

    The ground is graded or compacted to the agreed finish and the permit is closed.

Equipment and method

The Right Machine for Each Kind of Concrete

The tool follows the material and the access. Every photo here is from one of our own jobs.

Hydraulic breaker on an excavator breaking the wall of an in-ground pool

Hydraulic breaker

Mounted on an excavator, it splits thick, reinforced concrete such as walls, footings and pool shells.

Mini excavator breaking up a concrete pool next to the house

Mini excavator

Works close to the house and through narrow side yards, where a full-size machine cannot reach.

Excavator demolishing a backyard pool, with broken concrete in the shell

Excavator

Breaks and loads concrete faster when the lot is open enough for a larger machine.

Cicarelli crew working inside a pool being demolished, surrounded by broken concrete

Hand work

Jackhammers and the crew finish edges and corners the machines cannot reach without damaging what stays.

Pricing

What Sets the Price of a Demolition Job

There is no fair per-square-foot price for demolition, because the same slab can be easy or hard to remove. These are the things we measure before we write a number.

  • Volume and thickness

    A thin patio slab and a thick, reinforced driveway are different jobs, even at the same size.

  • Hauling and disposal

    Concrete is heavy, so the number of truckloads and the distance to the recycler add up quickly.

  • Access to the work

    Open driveways let big machines in; side yards, steps and slopes mean smaller equipment and more hand work.

  • Permits and notices

    Structures need a permit and an air district notice, and some cities add inspections or recycling reports.

  • Hazardous materials

    Asbestos or lead found in an older garage or house has to be handled before demolition goes on.

  • Finished ground

    Rough cleanup costs less than graded, compacted ground ready for pavers or a foundation.

Our hard demolition cost guide goes line by line, or send photos for a written, itemized quote. Get a written quote

Permits and notices

Permits, Air District Notice and Debris Rules

Demolishing a structure in the Bay Area takes more than a city permit. The air district has to be notified first, utilities shut off, buried lines marked, and some cities track where the debris goes. We file each of these before the first machine starts.

  • The CSLB reminds homeowners that California's building code bars removing or demolishing any building or structure without a separate permit, and sends them to the local building department for the details, in its permit guidance.
  • The Bay Area Air District has to hear about every demolition at least 10 business days ahead, asbestos or not, while homes with four or fewer units can use a 72-hour notice for an added fee, on its asbestos program page.
  • Under Cal/OSHA's demolition safety order, pipe covering, fireproofing and duct work are surveyed for asbestos, and the utilities are notified and shut off, capped or controlled before demolition begins.
  • In Oakland, taking down more than half of a building's exterior walls counts as demolition, and each demolition needs Planning approval and a building permit first, per its demolition permit page.
  • Berkeley lists demolition of an existing structure among the jobs that need a building permit, on its building permits page, and Albany asks for a Bay Area Air District J Number plus a building permit before any complete building, such as a garage, comes down, per its building demolitions handout.
  • Oakland also wants an approved Recycling Plan before it issues a permit, per its construction and demolition page, and El Cerrito asks covered projects to recycle or salvage at least 65 percent of the waste under CALGreen, in its C&D policy.

San Jose requires the air district job number even for a pool or spa demolition, on its pool demolition page. More on the paperwork in our guide to hard demolition in California. Before any digging, USA North 811 needs at least two working days' notice.

Homeowner guide

Demolition Contractor Questions, Answered With Sources

Choosing a demolition company raises the same questions on almost every Bay Area job: what kind of demolition it is, what it costs, which paperwork applies and where the debris goes. These answers rely on state and regional rules, not on guesses.

What are the three types of demolition?

On home projects, contractors usually separate three kinds: soft or interior demolition, which strips finishes and keeps the structure; selective demolition, which removes one part such as a garage, slab or wall; and full demolition, which takes a building down to and including its foundation. Each carries different permits and equipment.

Hard demolition is the trade name for the heavy end of that range: concrete, masonry and structure taken out with machines. Our hard demolition guide explains where the line falls.

How much does a demolition contractor cost?

There is no honest flat rate. The price follows the volume and thickness of what comes out, access for machines, truckloads and disposal, permits and notices, any asbestos or lead work, and how finished the ground must be. A written quote that lists each of those lines is the only number worth comparing.

Our guides to concrete demolition cost and house demolition cost walk through each line. California also requires a written contract for home improvement work over $500, as the CSLB explains.

Do I need to notify anyone before demolishing a garage?

Yes. Besides the city permit, the Bay Area Air District must be notified at least 10 business days before any demolition, whether or not asbestos is present, with a 72-hour option for small residential buildings. Utilities are shut off and capped, and 811 is called before the footings are dug out.

When a detached garage is being replaced by an ADU, the city reviews the demolition permit together with the ADU application and issues both at once, under Government Code section 66314.

How long does a demolition project take?

The demolition itself is often the shortest stretch. On a lot with good access, a garage and its slab are usually down and hauled away in a matter of days, not weeks. The permit, the 10-business-day air district notice and the utility shut-offs tend to take longer, so the start date depends on paperwork more than on machines.

Wet-season grading limits in some cities can move the earthwork too; our guide to the best season for a demolition project lays out the calendar.

What license does a demolition contractor need in California?

The CSLB has a specialty classification for this work, C-21 Building Moving/Demolition, for contractors who demolish and remove structures and their foundations. General building contractors (class B) take on projects that combine at least two unrelated trades. Cicarelli Contractors holds B license #1109419, and any license can be checked on the CSLB website.

The CSLB publishes every class on its licensing classifications page, including the C-21 description. Our own record is at cslb.ca.gov/1109419.

Where does demolition debris go?

Clean concrete is usually trucked to a recycler and crushed into aggregate, the process CalRecycle describes for recycled concrete. Wood, metal and mixed debris are separated where possible. Cities apply CALGreen or their own stricter rule, so some ask for a recycling plan before a permit is issued.

Oakland, for example, asks for a Summary Report on the debris before the final inspection can be scheduled. CalRecycle covers the state side on its construction and demolition page.

Bay Area demolition notices and lead times
RequirementRule and source
City demolition permitRequired for any building or structure (CSLB)
Air district notice10 business days ahead; 72 hours for 4 units or fewer, with a fee (BAAQMD)
Asbestos surveyPipe covering, fireproofing and duct work (Cal/OSHA 1735)
Utility locate2 working days before digging (USA North 811)
Written contractHome improvement work over $500 (CSLB)
Debris recyclingCALGreen or a stricter local rule (CalRecycle)

Summarized from the official pages linked above; your city may add steps of its own.

Updated · By Athalyson Bernardo, Owner of Cicarelli Contractors · CSLB #1109419

FAQ

Demolition FAQ

Have Something That Needs to Come Out?

Send photos of what needs to go and of the way in, and we will reply with a written estimate. We answer the phone Monday to Saturday, 9 am to 5 pm, and other topics are in the site FAQ.

Call (650) 404-7049
What does a demolition contractor do?

A demolition contractor plans and carries out the removal of structures and hardscape: concrete slabs, driveways, garages, pools or whole houses. The job covers the permit and notices, utility shut-offs, the breaking itself, debris hauling and leaving the ground graded. On a home project it is the step that clears the way for building.

Do I need a permit to demolish a structure in California?

Yes, in almost every case. The CSLB notes that the California building code does not allow any building or structure to be removed without a separate permit, and cities add rules of their own. A flat patio may need less paperwork in some cities, so we confirm with your building department first.

How far ahead do I have to notify the air district?

At least 10 business days before the demolition, whether or not the structure contains asbestos. For residential buildings with four or fewer units, the Bay Area Air District accepts a 72-hour notice if you pay an additional fee. We file the notice and keep its job number with the permit records.

Can you demolish a garage to make room for an ADU?

Yes. We take out the garage, its slab and footings, cap the utilities and leave a graded pad for the ADU builder. When a detached garage is replaced by an ADU, California law has the city review both permits together, so ask your designer to include the demolition in the ADU submittal.

Is asbestos testing required before demolition?

For older structures, plan on it. Cal/OSHA requires pipe covering, fireproofing and duct work to be surveyed for asbestos before demolition, and roofing, siding or flooring from past decades can contain it too. If testing finds asbestos, it is removed by an abatement contractor before the demolition goes on.

How do I get a demolition estimate?

Call or text (650) 404-7049, Monday to Saturday, 9 am to 5 pm, or send photos through the free estimate form showing what has to come out and how a machine would reach it. We reply with a written, itemized estimate within 24 hours of the photos or the site visit.