Cicarelli Contractors, a CSLB-licensed general contractor (License #1109419) based in Richmond, California, serves 12 cities in Alameda County, 10 miles from our base, with pool removal, demolition, excavation, pavers, retaining walls and artificial turf. We pull the permits and send a written quote within 24 hours.
Cicarelli Contractors projectPaver patio and seat wall
East Bay
Working in Alameda County
Alameda County starts a few minutes south of our Richmond base. Albany and Berkeley border western Contra Costa, so the crew is in the East Bay flats and hills every week, from Oakland and the island city of Alameda down to Fremont.
On hillside lots in Berkeley and Oakland, a patio or ADU pad can need grading, drainage and a retaining wall first. Oakland publishes detailed demolition and grading rules, including a seasonal limit on grading, so the timing of a project matters here.
Alameda County services
Pavers in Oakland, Concrete and Pool Removal Across Alameda County
From Berkeley hillsides to Livermore backyards, we work as the paver and concrete contractor Oakland homeowners search for, and as the general contractor that pulls the permit.
Pool removal in Livermore, Fremont, Pleasanton and Oakland with the city demolition permit, haul-off and compacted backfill. Our Fremont pool demolition is on video.
Need a concrete contractor in Oakland? We remove and replace driveways, patios and slabs, with grading scheduled around Oakland's October 15 to April 15 limit.
Paver driveways, patios and front walks in Oakland, Berkeley, Dublin and Livermore, set on a compacted base with clean borders and a written quote in 24 hours.
Hillside retaining walls that create level ground on Oakland and Berkeley lots, with drainage behind the wall and the grading permit when the city requires one.
Artificial turf installation for Livermore, Pleasanton, Dublin and Oakland yards: a drained, compacted base and turf that handles Tri-Valley summer heat without watering.
Watch a Fremont Pool Demolition and Other East Bay Jobs
The first clip is a pool demolition in Fremont, in southern Alameda County. Next to it: a San Ramon pool removal, a Walnut Creek retaining wall and a Hillsborough pool job by the same crew.
Cicarelli just completed our pool demolition job promptly and professionally. I was very pleased that he was able to start so quickly. And I would recommend him. It was very convenient for me that he was able to text me updates and send me photos along the way of the work done. Super for the great work completed!
BBay Cleaning CoPool removal
★★★★★
2024
We recently hired Cicarelli Contractors to remove our old, unused pool, and we couldn’t be more pleased with the results! From the start, their team was professional, punctual, and extremely knowledgeable. They walked us through the entire process, providing clear explanations and a fair estimate.
A city on the east shore of the Bay, between Albany and Oakland, named after the philosopher George Berkeley, with neighborhoods from the flats to the hills.
The Alameda county seat and largest city in the East Bay, with Lake Merritt at its center and detailed demolition and grading rules. Population 440,646.
An island city in San Francisco Bay, built on Alameda Island, Bay Farm Island and Coast Guard Island. Its name means "tree-lined path". Population 78,280.
In Alameda County, the city where the home sits issues the building or demolition permit. Homes in unincorporated areas get it from the county instead, through Alameda County Public Works permits. Each office sets its own fees, plans and inspections, and Cicarelli Contractors pulls the permit and schedules every inspection.
Local rules in Alameda County
Oakland requires a demolition permit when more than half of a building's exterior walls are demolished, and says all demolitions need Planning approval and a Building Permit before work begins, on its demolition permit page.
Oakland runs a wet weather grading moratorium from October 15 to April 15, when grading approval is normally not granted except for emergency stabilization, according to its wet weather grading page.
Oakland's grading permit page lists triggers such as excavation or fill over 50 cubic yards on slopes over 20 percent or deeper than five feet.
Pool removal and backyard projects in Alameda County: what to know
A pool removal or backyard project in Alameda County starts with one question: who issues the permit. Across the 12 cities we serve in Alameda County, the city building department issues it; in unincorporated areas, Alameda County Public Works permits does. Cicarelli Contractors, a CSLB-licensed general contractor based in Richmond, pulls the permit, schedules the inspections, removes the pool or concrete and builds what comes next with the same crew.
How long does it take to get a building permit in Alameda County?
It depends on the city and the season. A simple demolition permit moves faster than a project that needs plan review, and in Oakland, grading approval is normally not granted from October 15 to April 15 except for emergency stabilization. Plan earthwork for the dry season.
For a job in Berkeley, Albany and Oakland, the written estimate from Cicarelli Contractors lists the permit, the inspections and the order of the work, and the crew sends photo updates while it is underway. See the official Alameda County Public Works permits site for current processing notes.
Do you need a permit to fill in a pool in Alameda County?
Plan on one. Bay Area cities treat pool removal and fill-in as demolition, and Oakland says all demolitions need Planning approval and a Building Permit before work begins. In unincorporated Alameda County, the Public Works Agency takes the application through the Alameda County Permit Portal.
Keep the permit and the final inspection with your house records in Berkeley and Albany; buyers and future contractors ask for them. More on the pool removal page.
What can you build after a pool removal in Alameda County?
A lawn or turf can go over a partial removal, while an ADU, an addition or deck footings need a full removal with compacted fill. In Oakland, plan any grading for mid-April to mid-October, because grading approval is normally not granted during the wet weather moratorium.
Pool removal rules to know in Alameda County
Where
Rule
Oakland, demolition
Planning approval and a Building Permit before any demolition begins
Oakland, grading
Permit triggers include fill over 50 cubic yards on slopes over 20 percent; no grading approval Oct 15 to Apr 15, except emergencies
Unincorporated Alameda County
Apply through the Alameda County Permit Portal (Public Works Agency)
Does Cicarelli Contractors work in all of Alameda County?
Yes. Cicarelli Contractors works in 12 cities in Alameda County, including Berkeley, Albany, Oakland, Alameda, Fremont and Hayward. Unincorporated communities in the county can usually be confirmed with a quick call. Every job starts with a free on-site estimate and a written quote within 24 hours.
Do you need a licensed contractor for pool demolition in Alameda County?
Yes. California's Contractors State License Board licenses this work under classifications such as B General Building, C-21 Building Moving and Demolition and C-53 Swimming Pool. Cicarelli Contractors holds B license #1109419. Before you hire anyone in Alameda County, ask for the license number and look it up on the CSLB website.
How do I apply for a building permit in Alameda County?
In unincorporated Alameda County, apply through the Alameda County Permit Portal run by the Public Works Agency, which also handles plans, inspection scheduling and permit status. In Oakland, Berkeley or another city, apply to that city's building department. Cicarelli Contractors prepares the application, pulls the permit and schedules the inspections.
How long does a pool removal take in Alameda County?
It depends on the pool, the access and the season. In Oakland, a job that needs a grading permit is normally not approved between October 15 and April 15, so it is scheduled for the dry months. A demolition that needs Planning approval also waits for that sign-off.
Can you grade a yard in Oakland during the rainy season?
Usually not. Oakland runs a wet weather grading moratorium from October 15 to April 15, and grading approval is normally not granted in that period except for emergency stabilization. Projects that need a grading permit in Oakland are best planned for the dry season, from mid-April to mid-October.
How do I get a free estimate in Alameda County?
Send photos of your yard and your address in Berkeley, Albany and Oakland or anywhere else in Alameda County through the free estimate form, or call or text (650) 404-7049. Cicarelli Contractors visits, measures the work and sends a written quote within 24 hours that lists the work, the permit and the schedule.